Summary:
The Lower Thames Flood Risk Management Strategy (LTFRMS) proposes measures to reduce the risk of flooding to the 15,000 properties which are currently at risk from a 1% flood event in the area from Datchet to Teddington. These measures include the construction of three flood diversion channels, the widening of Desborough Cut and improvements to Sunbury and Molesey Weirs and Teddington Lock. It also includes community based measures for improving resistance and resilience to flooding for smaller groups of properties and improving mapping information for emergency evacuation plans.

SECTION 1:
DATCHET to below BELL WEIR

bypassing Old Windsor Lock & Bell Weir Lock

SECTION 2:
THORPE to CHERTSEY

bypassing Penton Hook Lock

SECTION 3:
LALEHAM PARK to D'OYLY CARTE ISLAND

bypassing Chertsey Lock? & Shepperton Lock
(Intakes above & below Chertsey Lock?)

Various DESBOROUGH ISLAND OPTIONS
Then changes to Locks & weirs downstream (SUNBURY, MOLESEY, & TEDDINGTON)